Middle Road Pit
Click on the image to download a PDF.
A quick and dirty analysis of shifting elements. The grading to the west has been steepened to 2:1 and the array has been shifted west. The grading to the east has started at the 140’ desired buffer and remains at 2:1. This results in 90% of the panels proposed in the early January BSC Plans. With a bit of work proposing to regrade more of the western side of the property, one could squeeze another few panels on that side.